Open the tailgate.
Disconnect the vehicle start-up battery.
Remove parcel shelf.
Remove the loadspace floor trim.
Remove the loadspace treadplate but pulling it up from its x6 clips.
Release the lower edge of the loadspace trim panels on both sides of the vehicle.
Remove junction box access panel
Remove foam tool tray.
Remove the rear under tray.
Remove the rear bumper.
Mark and cut a hole in the air suspension compressor tray for the bike carrier harness.
Remove and retain x6 fixings to remove the rear bumper valance from the rear bumper.
Locate and secure the template as illustrated.
Mark the x3 hole positions on the bumper valance. Use the template to identify where to mark the hole positions.
Drill and cut the holes in the bumper valance for the x2 fixings (C) and the bike carrier harness (A).
Feed the section of the bike carrier harness (B1) that is attached to the bike carrier harness socket, through the hole in the bumper valance. The arrowed grommet for the air suspension tray must go through the hole.
Install the bike carrier harness socket to the bumper valance using the x2 fixings (C) and x2 washers (D).
Install the bumper valance, with the bike carrier harness, to the rear bumper with x6 fixings that were retained when it was removed.
Install the rear bumper.
Install the bike carrier harness grommet to the air suspension compressor tray.
Install bracket (U) with fixings (V) and (W).
Install the (R) to bracket and secure using x2 M6 nuts (S).
Place the bike carrier harness (B2) into the loadspace.
Connect the bike carrier harness (B2) to the trailer light module (R).
Remove the blanking plug from the vehicles body harness connector.
Connect the bike carrier harness (B2) to the vehicle body wiring harness as illustrated.
Route the bike carrier harness (B2) along the top of the vehicle body harness.
Connect together the 2 parts of the bike carrier harness (B1) and (B2) as illustrated.
Secure the bike carrier harness (B1) and (B2) to the vehicle body wiring harness.
Attach the bike carrier harness (B2) to the ground point using the earth bolt as illustrated.
Secure the bike carrier harness (B1) and (B2) to the vehicle body wiring harness using the tie clips (H) at the 3 locations as illustrated.
Diagnostic.
Install the rear under tray.
Install the foam tool tray.
Install junction box access panel
Secure loadspace side trim panel on both sides of the vehicle.
Install an clip into place the loadspace treadplate with its x6 clips.
Install parcel shelf.
Connect the vehicle start-up battery.
Close the tailgate.